Advanced Link Settings

How to use advanced link options

Carissa Castro avatar
Written by Carissa Castro
Updated over a month ago

Overview

This article describes the following topics:

  • Skipping actuals/forecast


Skipping Actuals/Forecast

Links calculate in all time steps by default. In the Advanced Link Settings, there are two options to skip the calculation in the actuals time period or the forecast time period.

Using these options allows for creating two calculations for the same set of nodes without creating a circular reference.

For example, the same nodes can be used in two calculations. The links highlighted in green have been set to skip the related periods.

Calculation in the Actuals periods only (skip forecast):

Calculation in the Forecast periods only (skip actuals):